Commit Graph

53 Commits

Author SHA1 Message Date
fireshaper 103f8f1e72 Record CR-023: shop time counts as rest (Phase 23)
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-11 17:55:49 -04:00
fireshaper e17abb3a3e Fix: Contracts counts ready ships, not idle ships (decision 0.5.134)
CI / check (push) Successful in 6m59s Details
A ship whose pilot was resting still showed on the location chips as
available. The chips and the Jobs badge now count only ships a job could
go out on now; the board names who wakes first when none is ready.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-11 17:41:12 -04:00
fireshaper eb9b0de5e4 Fix: boards ignore Independent pilots (decision 0.5.133)
CI / check (push) Successful in 7m16s Details
The board's qualifying fleet counted Independent pilots and their ships,
so the player saw jobs only an Independent pilot could fly. Generation
and the read filter now use the player's Manual pairs, falling back to
the whole fleet when there are none.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-11 16:58:54 -04:00
fireshaper 8507fa7c1e Record CR-022: welcome screens (Phase 22)
Received as CR-020 for Phase 20; renumbered. Decisions 0.5.131-0.5.132.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-11 13:29:34 -04:00
fireshaper 0cb8e364c6 Step 21.9: plan amendments and regression
CI / check (push) Successful in 6m44s Details
CR-021 §6: plan 0.3, 0.5 and 12.1, CR-001 goals note, CR-014 Step 14.6
(the event-queue catch-up) and CR-019 (pilots choose from completable
boards). Full suite and e2e pass.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-11 10:53:53 -04:00
fireshaper 32603d5d7e Renumber Independent Pilots to CR-021, Phase 21
CI / check (push) Successful in 6m32s Details
CR-020 and Phase 20 went to the Bridge dashboard, recorded first in
another session. Independent Pilots is CR-021 (decisions 0.5.122-0.5.130);
its Steps 20.1-20.5 commits are Steps 21.1-21.5.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-10 23:36:46 -04:00
fireshaper f7bbc6c1ea Record CR-020: independent pilots (Phase 20)
Received as CR-019 for Phase 19; renumbered. Decisions 0.5.118-0.5.126.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-10 22:59:17 -04:00
fireshaper 716002b3c7 Step 20.4: CR-020 amendments, regression and screenshots
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-10 22:34:15 -04:00
fireshaper 4b6bf64a82 Record CR-020: Bridge dashboard and HQs tab (Phase 20)
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-10 22:19:51 -04:00
fireshaper e9d5a7e463 Step 19.5: plan amendments and regression
CI / check (push) Successful in 6m35s Details
CR-019 §6 amendments (plan 0.5.52, 0.5.53, 3.9, 9.4, 12.1; CR-002,
CR-006, CR-007). The balance player reads boards for the qualifying
fleet; e2e 12.6 learns Heavy Cargo before a Heavy job is offered.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-10 21:04:08 -04:00
fireshaper ad1b8c76d9 Record CR-019: only show jobs the fleet can complete (Phase 19)
Received as CR-018 for Phase 18; renumbered. Decisions 0.5.114-0.5.117.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-10 20:28:29 -04:00
fireshaper 86e511f181 Step 18.5: plan amendments and regression
CI / check (push) Successful in 6m25s Details
CR-018 §6: plan 0.5.94, 0.5.96, 0.5.97 and 12.1, CR-015 §3, D5, Steps
15.4 and 15.6, CR-013 Step 10M.3 amended. The e2e flying helper refuels
before each trip now that ships are on Manual.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-10 19:25:37 -04:00
fireshaper e5eebdd8aa Record CR-018: fuel tuning (Phase 18)
Received as CR-017 for Phase 17; renumbered. Decisions 0.5.110-0.5.113.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-10 17:17:48 -04:00
fireshaper d57919b382 Step 17.7: plan amendments and regression
CI / check (push) Successful in 6m20s Details
CR-017 §6: plan 0.5.30, CR-001 (story, 0.5.22, Steps 10A.1, 10A.3,
10A.7, 10A.8) and CR-011 Step 10H.4 amended. Full suite and balance
targets pass.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-10 16:25:00 -04:00
fireshaper a95b94d73d Record CR-017: tutorial XP and skill point prompt (Phase 17)
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-10 15:58:17 -04:00
fireshaper 55c5e3c2c7 Step 16.9: plan amendments and regression
CI / check (push) Successful in 6m22s Details
Applies CR-016's amendments to the implementation plan (eight
locations, the deferred list, content, map art, goods, fuel and balance
notes) and documents the belt and label planning. Phase 16 is complete.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-10 14:15:24 -04:00
fireshaper 264783088e Record CR-016: Venus, Io, Europa and the asteroid belt (Phase 16)
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-10 13:21:00 -04:00
fireshaper f415227dbf Step 15.9: plan amendments and regression
CI / check (push) Successful in 7m25s Details
Applies CR-015's amendments to the implementation plan (deferred list,
decisions, content, sim, client and phase notes). The balance check now
also confirms no simulated ship ever needs emergency fuel while the
player has credits on Auto top-up. Phase 15 is complete.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-10 02:03:01 -04:00
fireshaper 23b3d7ec97 Record CR-015: fixed map and fuel tanks (Phase 15)
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-10 00:30:40 -04:00
fireshaper 13eb058052 Step 14.12: plan amendments and regression
CI / check (push) Successful in 5m52s Details
Applies CR-014's amendments to the implementation plan (server phases
superseded, client and end-to-end steps amended, Phase 13 replaced by
static hosting) and adds its table for translating later change
requests as plan section 0.6. Rewrites tech-stack.md for the
local-first stack. Phase 14 is complete.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-09 23:56:38 -04:00
fireshaper 8ffd408290 CR-014: record the local-first change request
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-09 19:09:22 -04:00
fireshaper 5c9534036f Step 13.1: containerize the server
CI / check (push) Has been cancelled Details
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-06 17:41:14 -04:00
fireshaper c02126c908 Step 12.1: balance simulation, economic distance and reachable first contact
CI / check (push) Successful in 6m17s Details
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-05 19:16:32 -04:00
fireshaper feb84aecaa Step 11.1: installable PWA
CI / check (push) Successful in 6m11s Details
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-05 17:53:56 -04:00
fireshaper 60069b14f6 Step 10M.5: CR-013 plan amendments and regression
CI / check (push) Successful in 5m10s Details
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-05 12:02:57 -04:00
fireshaper 038f09bb50 CR-013: record the veteran's Clipper change request
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-05 11:26:22 -04:00
fireshaper f7cb312ea1 Step 10L.11: CR-012 plan amendments and regression
CI / check (push) Successful in 7m27s Details
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-05 03:24:02 -04:00
fireshaper 776a890757 Step 10L.4: reach table tuning
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-05 01:32:01 -04:00
fireshaper e1ce7ee7d0 CR-012: record lighter, clipper and per-leg range change request
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-05 00:59:33 -04:00
fireshaper cab0a1cb81 Step 10K.12: CR-011 plan amendments and regression
CI / check (push) Successful in 4m59s Details
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-05 00:11:48 -04:00
fireshaper 5813fce556 CR-011: record settings screen and company backup change request
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-04 22:53:11 -04:00
fireshaper fcdefb911f Step 10J.7: CR-010 plan amendments and regression
CI / check (push) Successful in 4m28s Details
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-04 22:27:38 -04:00
fireshaper 727b0c02da CR-010: record veteran pilot and profit-share pay change request
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-04 21:18:20 -04:00
fireshaper 5a2efe5da6 Step 10I.9: CR-009 plan amendments and regression
CI / check (push) Successful in 4m9s Details
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-04 19:47:45 -04:00
fireshaper bf166c1deb CR-009: record ship upgrades change request and decisions
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-04 19:03:36 -04:00
fireshaper 4acf346005 Fit jobs pick from all goods that fit; no undersized heavy lots
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-04 18:20:56 -04:00
fireshaper 394fc1b0db CR-008: boards that feel fresh (Phase 10H) plan
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-04 17:56:36 -04:00
fireshaper edbe31593b Step 10G.11: CR-007 plan amendments, regression and review screenshots
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-04 17:27:04 -04:00
fireshaper bdd5fd8509 CR-007: cargo goods, Priority and shippers (Phase 10G) plan
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-04 16:49:14 -04:00
fireshaper 169dc5d4c5 Step 10F.5: CR-006 plan amendments and regression
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-04 12:23:27 -04:00
fireshaper bd2d2df14d Step 10F.1: highlight jobs too heavy for your ships
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-04 12:15:04 -04:00
fireshaper f4ddf1dc04 Step 10E.9: CR-005 plan amendments, regression and review screenshots
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-03 22:55:43 -04:00
fireshaper 45eafb2503 Step 10E.1: fonts, theme tokens and space backdrop
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-03 22:24:29 -04:00
fireshaper 7d8eb3fcfe Step 10D.10: CR-004 plan amendments and regression
CI / check (push) Successful in 3m34s Details
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-03 22:14:04 -04:00
fireshaper 0aecda66d7 CR-004: record change request and decisions
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-03 21:40:16 -04:00
fireshaper 99aebe1dcb Step 10C.10: CR-003 plan amendments, review screenshots and regression
CI / check (push) Successful in 3m33s Details
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-03 19:42:19 -04:00
fireshaper 23b40a4324 CR-003: record change request and decisions
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-03 18:58:49 -04:00
fireshaper f7698166bb Step 10B.10: CR-002 plan amendments, GDD update and regression
CI / check (push) Successful in 3m13s Details
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-03 15:16:18 -04:00
fireshaper ea37ce8ced CR-002: record change request and decisions
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-03 14:39:31 -04:00
fireshaper c36d1edf55 Give every contract board jobs for each ship size
CI / check (push) Successful in 2m46s Details
Bay contract mass now comes from per-ship-size bands, and the first
contract in each band is a no-skill Standard job to a discovered
location, so a new player with only a Courier always has work.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-03 12:22:02 -04:00