Commit Graph

3 Commits

Author SHA1 Message Date
fireshaper d6bca5b1a2 Step 15.1: content: fixed positions
CI / check (push) Successful in 7m40s Details
Locations get fixed polar coordinates (the Moon as an offset from
Earth) and astronomy-engine is removed, so positions now come from
content. Ranges move into CR-015's reach bands for the fixed distances,
and the Lighter's price drops to 36,000 to keep the balance targets.
Date-sampled tests become yes/no.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-10 00:43:09 -04:00
fireshaper 13eb058052 Step 14.12: plan amendments and regression
CI / check (push) Successful in 5m52s Details
Applies CR-014's amendments to the implementation plan (server phases
superseded, client and end-to-end steps amended, Phase 13 replaced by
static hosting) and adds its table for translating later change
requests as plan section 0.6. Rewrites tech-stack.md for the
local-first stack. Phase 14 is complete.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-09 23:56:38 -04:00
fireshaper 66308e7cdc Step 1.1: create pnpm monorepo
pnpm workspace with apps/web, apps/server, packages/sim, packages/schema
and packages/content, each extending a strict tsconfig.base.json.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-02 17:28:27 -04:00